Buying an aerial work platform base is a compliance purchase as much as an equipment purchase. The base carries people, it operates at height, and it will be inspected by someone other than the buyer. The specification, the test evidence and the documentation package matter as much as the working height and the platform capacity.
This guide sets out what to specify, what to test before acceptance, and what documents to demand with delivery.
Quick answer
A complete aerial base procurement package has four parts: a specification that states rated capacity, working height, platform dimensions, travel speed, gradeability and drive type; a pre-delivery test record covering load test, stability, brake performance and electrical insulation; a documentation set including drawings, load charts, maintenance manual and conformity evidence; and a site acceptance test performed by the buyer before final payment. Missing any one of the four is how projects end up with a machine that cannot be put into service.
Why the electric drive changes the procurement checklist
A diesel or petrol platform base is procured mainly on mechanical criteria. An electric base adds a battery system, a charger, a motor controller and often a battery management system. Each of those introduces a specification field and a test that a mechanical machine does not need.
| Criterion | What to specify | Why it matters |
|---|---|---|
| Battery chemistry and capacity | kWh and chemistry, with the usable fraction stated | Determines shift capability; usable fraction is often much less than nominal |
| Charging time and charger input | Hours to full charge; charger voltage and current | Determines whether the machine fits a single-shift or multi-shift pattern |
| Duty cycle statement | Continuous, intermittent or defined raises per hour | Electric drive thermal limits are duty-cycle dependent |
| Regenerative braking | Whether fitted and how it interacts with the brake system | Affects brake wear and energy recovery |
| Insulation monitoring | Whether an insulation fault monitor is fitted | A traction battery on a steel structure needs fault detection |
| Emergency lowering with power loss | Manual or stored-energy method | Required for operator rescue; must be documented |
| Ingress protection of the electrical enclosure | IP rating of the controller and battery box | Outdoor and wash-down exposure |
The specification fields that must be unambiguous
Ambiguity in these fields is where disputes come from. Each one should be stated with a value and a tolerance.
| Field | State it as | Common ambiguity |
|---|---|---|
| Rated capacity | kg, with the number of persons allowed | Whether the figure includes tools and materials |
| Working height | m, measured from ground to platform floor | Whether it is platform height or working height (1.8 – 2 m difference) |
| Platform dimensions | Length x width in mm, with the extension length | Whether the extension is included in the rated capacity |
| Travel speed | km/h, raised and lowered separately | Whether the figure is at full load |
| Gradeability | Percent grade, laden | Whether it is at full load and on a specified surface |
| Turning radius | Inside and outside radius in mm | Whether it is with or without the platform extended |
| Wheelbase and track | mm | Rarely stated; critical for site access |
| Ground bearing pressure | kPa or kg/cm² | Almost never stated; the most common cause of site refusal |
| Noise level | dB(A) at operator position | Measured distance rarely stated |
| Battery endurance | Hours or raises, with duty stated | Whether measured at full load |
Pre-delivery tests the buyer should witness or require evidence of
| Test | Method | Evidence to require |
|---|---|---|
| Rated load test | Apply rated load; operate through full envelope | Signed test record with load, duration and observations |
| Overload test | Apply the specified overload percentage; confirm no permanent deformation | Test record with the percentage and inspection result |
| Stability test | Operate at rated load on the maximum specified slope | Record with slope angle and load |
| Brake performance | Measure stopping distance laden on the specified grade | Measured data, not a statement |
| Emergency lowering | Simulate power loss; operate the emergency lowering | Record with time to lower and method used |
| Insulation test | Measure insulation resistance of the traction circuit | Measured value with the instrument identified |
| Function test | Every control at every position, including interlocks | Checklist with each function ticked |
| Tilt and level cut-out | Operate on a slope beyond the limit; confirm the cut-out operates | Record with the slope at which the cut-out triggered |
The documentation package
The documentation package should be listed in the purchase order as a deliverable, not requested later. A machine without the package is a machine that cannot be inspected or maintained to a defensible standard.
- General arrangement drawing with dimensions and weight.
- Load chart or rated capacity table, including the extension condition.
- Electrical schematic with wire identification and component references.
- Hydraulic schematic if the platform has hydraulic functions.
- Operation manual in the language of the destination market.
- Maintenance manual with service intervals and torque values.
- Parts list with part numbers for wear items.
- Test records for each item in the pre-delivery list.
- Battery specification sheet and charger instructions.
- Declaration of conformity or equivalent, where the destination market requires it.
Site acceptance test: the buyer's own verification
The site acceptance test is not a repeat of the factory test. It verifies that the machine as delivered, in the buyer's conditions, behaves as specified.
| Test | Acceptance criterion | What a failure indicates |
|---|---|---|
| Full envelope operation at rated load | All functions operate smoothly, no alarms | Assembly or commissioning error |
| Stability on the steepest site slope | No cut-out triggered below the stated limit | Cut-out set point wrong, or stated limit overstated |
| Gradeability trial | Climbs the stated grade laden without stalling | Motor or controller undersized for the specification |
| Battery endurance trial | Meets the stated shift capability at site duty | Endurance overstated, or duty cycle misunderstood |
| Brake test on site surface | Stopping distance within the stated figure | Brake adjustment, or surface assumption wrong |
| Emergency lowering | Operates within the documented time | Stored energy depleted, or valve fault |
| Control response at full extension | No lag or jitter | Controller tuning or wiring issue |
| Noise measurement | Within the specified level at the operator position | Hydraulic or drive noise above specification |
Ground bearing pressure: the specification omission that stops projects
Ground bearing pressure is rarely stated in a quotation, and it is frequently the reason a platform cannot be used on the site it was bought for.
| Site surface | Indicative bearing capacity | Implication |
|---|---|---|
| Reinforced concrete slab | High | Most platforms acceptable |
| Compacted hardcore | Moderate | Check point loads at the outriggers or wheels |
| Asphalt over sub-base | Moderate, temperature dependent | Summer softening can reduce capacity sharply |
| Graded soil | Low | Load spreading mats likely required |
| Suspended slab or basement roof | Structure dependent | Requires a structural assessment, not a seat-of-pants judgement |
Ask the supplier for the laden point load at each wheel or outrigger. That number, not the total machine weight, is what the site engineer needs.
Commercial terms that protect the buyer
- Tie final payment to successful site acceptance, not to delivery.
- Require the documentation package as a deliverable with a stated delivery date.
- State a spare parts availability period, for example ten years from delivery.
- Require the supplier to state the service interval and the maintenance tasks the buyer can perform in-house.
- Define the warranty response time and the location of the service point.
- For export orders, agree the language of manuals and labels before manufacture, not after.
Frequently asked questions
What is the difference between platform height and working height?
Platform height is the height of the platform floor above ground. Working height adds a nominal reach allowance, commonly about 2 metres. Buying on platform height when you need working height is a frequent and expensive error.
Can an electric base work a full shift?
That depends on the battery capacity and the duty cycle. Ask for the endurance figure at full load with the duty cycle stated, and trial it on site before rolling out across a fleet.
Is a load test required before every use?
No. A full load test is a commissioning and periodic inspection item. Pre-use checks cover controls, brakes, emergency lowering and obvious damage.
What documentation should travel with the machine?
At minimum the operation manual, load chart, maintenance schedule and test records. For most markets, the conformity documentation is also required for the machine to be legal to operate.
How is gradeability affected by load?
Directly. A machine rated at a grade laden should be tested laden. Ratings quoted unladen are not usable for site planning.
Should outriggers be required for all work at height?
Not for all, but the conditions under which outriggers are required should be stated in the specification and the operation manual, not left to operator judgement.
What is a reasonable warranty period for an electric base?
Twelve months on the whole machine and a longer period on the battery, where the battery is a defined-capacity item, is a common structure. The critical variable is the response time, not the headline duration.
}Planning the site before delivery
A platform that arrives without the right charging infrastructure and site layout loses its first weeks of productivity. Our site integration guide covers power supply, charging workflow and surface preparation.